Completion Date June 2026 Duration 17 Weeks (Design + Installation) Standards FM Global Datasheet 8-34 Sprinkler Heads Installed 400+ Project OverviewHall & Kay was appointed to design and install a sprinkler protection solution for a new automated...
Case Study
Project Edward
Client Structure Tone Location Central London Sector Commercial System Equipment 1850+ Sprinkler Heads Duration 2.5 Years Completion Date March 2026 Hall & Kay successfully delivered a high-end sprinkler installation at 20 Carlton House Terrace, Central...
Comprehensive Security Transformation for Major International Shipping Port
Hall & Kay successfully delivered a flagship security transformation for one of the region's most critical international shipping ports. This multi-phase project enhanced surveillance coverage, intrusion detection, and access control across a vital gateway for...
High Tech Life Safety Manufacturer
Sector Manufacturing Client High Tech Manufacturing Client Location Skelmersdale Standards NFPA 13 Equipment FM Approved Sprinkler Tank 485 m3. 1 x Electric and 1 x Diesel FM approved fire pump rated at 1585 USGPM @6.5 bar. 3 x 150 mm FM Approved Wet Alarm Valves....
Retail Distribution Centre
Sector Retail Client Retail Distribution Centre Location Burton upon Trent Standards FM 8-9 , FM 8-34 System Equipment 2 x 355M3 effective capacity FM approve tanks 2 x FM approved Fire pumps rated at 2000 USGPM @ 8 bar 8 x 150mm Wet installation Control Valves...
Project Darwin
Comprehensive fire protection for a Healthcare’s flagship pharmaceutical warehouse in Birmingham
Elizabeth Tower
H&K are proud to be part of the tower’s biggest conservation in its history.
One Broadgate
Comprehensive design and installation of fire protection systems for a multi-level commercial office and retail development in central London.
One Nine Elms
Comprehensive design and installation of fire protection systems for a 42- and 57-storey mixed-use towers, accommodating hotel and residential spaces.
Harvey Norman
Two fast-track projects for Harvey Norman: the fit-out of their new flagship retail store at Merry Hill Shopping Centre and the complete fit-out of Warehouse S, their advanced distribution facility.
Leading UK Retailer
Major warehouse optimisation and automation logistics project involving removal of the existing beam pallet racking system and the installation of a new ASRS featuring automated mini loaders.
Project Omega
New 505,000 square feet flagship regional distribution facility at Omega Park Warrington.
Tech Manufacturing and Storage Facility
Sprinkler Protection to high tech manufacturing facility in Crewe.
Retail Facility, Bristol
Hall & Kay are proud to be chosen by an international retailer to design, supply, and install sprinkler systems through their new facility in Bristol.
Portwest Clothing – Phase 2
We were chosen to design, supply, install and commission the sprinkler systems, which involved installing the installation over of in excess of 8,000 Sprinklers throughout the building.
Leading UK supermarket
Hall & Kay are proud to protect 267 stores and 18 distribution centres across the UK and Ireland.
Wren Kitchens
Protecting Wren Kitchens 910,000sq.ft. manufacturing plant.
Solihull Community Housing
H&K successfully completed the largest residential retrofit project of its kind, installing sprinklers across 37 residential tower blocks and more than 1,900 apartments – which remained occupied while the work took place.
Kings Cross S3
Hall & Kay are proud to provide fire protection systems for another high-quality building as part of the Kings Cross regeneration.
Bloom Clerkenwell
Providing a fully integrated security system to protect 145,000 sq ft of work, retail and amentity space.
Thatchers Cider
Hall & Kay are proud to install systems for Thatchers new state-of-the-art manufacturing facility.
Musgraves, Dublin
Hall & Kay are proud to install 32,000+ sprinklers in this fast-track 12-month project.
Need to talk to someone?